OKVED Code: -01.25
The essence of the project: establishment of intensive orchard of fruit stone trees on a land plot area of 32 hectares with the use of a wire method of growing.
The status of the project: The project was fully implemented; an orchard was established on an area of 32 hectares. The project implementation enabled to create 7 jobs with an average monthly salary of 18 000 rubles, annual tax deductions – 0.8 mln rubles, project capacity – 2500 tons of fruit.